worker (working)
epoch 6 - Item 58 ACCEPTED (fred-skills f5c7edb + 5ccf236) -- well-confirmed entries. Item 59: Arched + taper TEMPLATE CODE (moved from seat C). Fred approved the full -15..+15 range, default 8, after my Fusion retest. Port the fixed construction from fb-app's f30_item5_arched_taper_diagram.mjs @4be8963 (incl. the waist re-solve); decide taper handle on T10 vs a new slot with data (T10 byte-identical at taper 0). All build rules, live at 5 angles + sizes, sweep clean. Fusion is yours. Brief in NEXT-SESSION.md.
updated 2026-10-03T08:28:59Z



























































+54 more, swipe in the vieweradvisor (reviewing)
T84 items 1-2 DONE: Arched Funnel (T16) + Tulip (T17) diagrams, lane-b, no code/Fusion. One shared bulgeArc-based builder (Tulip = Funnel + upperCurveFrac>0). Defaults from the advisor's own approved render, converted coordinate conventions. Also ran miterStaysInsideWood (neither reference script did), which caught a real thin-tip bug in my own first draft (Tulip reusing Funnel's own ranges) -- fixed by computing Tulip's own ranges with its curve depth active. All 15 panels/template clean: 6 miters, no thin tips, continuous, every bar >=0.75in. FLAGGED not resolved: dispatch+advisor render both say '7 bars', this diagram builds 6 (arch = 1 continuous tangent-apex piece, matching T7/T11 precedent) -- needs Fred's confirmation before this becomes template code. Shots in shots/seatB/ (0431_T84-item1/2-proposed_*). Pushed lane-b (19f7bbb).
updated 2026-10-03T08:33:42Z



























































+54 more, swipe in the viewerworker (working)
epoch 5 - Sand Timer diagram REVIEWED and sent to Fred. Advisor flag: every neck ends in sharp points (hairline contact at 6x9/7x9, needle tips at 9x12, sharper when the pinch is offset). That breaks the no-hooked/short-grain rule. Fred chooses: a blunt neck (flat bar ends at a small gap, one window) or a joined neck (sides meet with a miter, two windows). Don't redraw until he picks. Taper fix accepted (4be8963): Fusion confirms all four angles are closed. NEXT, not blocked: F31 item 2, Template 15 'Flask' DIAGRAM (brief in NEXT-SESSION-fb-app.md). Apply the header rules from the start: always miter, no thin/needle tips, simple and not too concave, plus the continuity check. Same size/variant grid. No code, no Fusion. Pass back with the path.
updated 2026-10-03T08:17:01Z



























































+54 more, swipe in the viewer4754aa0 Merge remote-tracking branch 'origin/lane-b' into HEAD 8 minutes ago19f7bbb T84 items 1-2: Arched Funnel (T16) + Tulip (T17) diagrams, no code 8 minutes ago8250bec docs: H23 item 59 -- Arched + taper template code moved to seat A 13 minutes ago5ccf236 H23 item 58: 5 probe scripts for the fusion360-quirks confirmations (timeline cost scaling, marker insertion, occurrence delete, cross-component body proxy, workspace activeProduct) -- skill text itself committed separately in fred-skills 15 minutes ago45614d3 docs: tick done T78-T83 items (stale); T84 items 1-2 -- Arched Funnel + Tulip diagrams moved from seat C 22 minutes ago8b1a438 Merge remote-tracking branch 'origin/lane-b' into HEAD 24 minutes ago4a5ce0b T82 item 7 (2/3 + 3/3): live-confirm degenerate lip + CAM Manufacture 24 minutes ago7475aad T82 item 7 (1/3): a window crossing the main opening degrades, never raises 34 minutes ago19f7bbb T84 items 1-2: Arched Funnel (T16) + Tulip (T17) diagrams, no code 8 minutes ago45614d3 docs: tick done T78-T83 items (stale); T84 items 1-2 -- Arched Funnel + Tulip diagrams moved from seat C 22 minutes ago8b1a438 Merge remote-tracking branch 'origin/lane-b' into HEAD 24 minutes ago4a5ce0b T82 item 7 (2/3 + 3/3): live-confirm degenerate lip + CAM Manufacture 24 minutes ago7475aad T82 item 7 (1/3): a window crossing the main opening degrades, never raises 34 minutes agode1d7cd docs: H23 item 58 -- record confirmed Fusion findings (timeline cost, marker insertion, occurrence delete) in fusion360-quirks 38 minutes ago807fec3 H23 item 57: win #1 (deferred compute across the stamp build) validated and REVERTED -- saves under 1s on all 3 Sends, the per-call costs are genuine solver work the existing deferred windows already don't suppress 39 minutes agoe1dc14f docs: H23 item 57 -- validate whole-stamp-build deferred compute (speed win #1) 47 minutes agod69a598 docs: F30 item 6 moved to seat A (H23 item 59) 13 minutes ago7e6e2e7 docs: F31 items 3-4 moved to seat B (T84) for parallel work 22 minutes ago6170609 docs: F31 item 1b -- Sand Timer template code, Fred approved the diagram as drawn 2 hours ago4bb9648 docs: F30 item 6 -- Arched + taper template code, Fred approved full -15..+15 range 2 hours ago5e0b5fa F31 item 1: Sand Timer (Template 14) diagram, 6x9/7x9/9x12, no code 2 hours ago4be8963 F30 item 5: fix shoulder/waist gap at negative taper, re-export + redraw 2 hours ago7f8bf5c F30 item 5: commit the Arched (T10) + taper diagram script 2 hours ago6664a9c F30 item 5: Arched (T10) + taper diagram, 7x9 + 6x9, no code 6 hours ago