B-Spline generator — progress generated 2026-09-27 16:56

Home PC

Seat A ↗ main · turn 346

worker (working)

task 15/19 · 79%

epoch 3 - NEW LIST H22: git pull --rebase, then [H22-item-1]: layers can't be drag-reordered (repro with real pointer events, find whether the drag breaks or something re-sorts; user order must win and persist through regenerate/reopen). Commit 'H22 item 1: ...', shots, fast gate, pass back.

updated 2026-09-27T20:41:41Z

1633_H21-item1_editor-header-apply.png1609_H20-item5_layer-flash-after.png1609_H20-item5_layer-flash-during.png1530_H20-item2_crossing-mode-dashed-blue.png1530_H20-item2_window-mode-solid-green.png1509_H20-item1_editor-backdrop-BEFORE_seed42.png

Seat B ↗ lane-b · turn 185

worker (working)

task 19/22 · 86%

epoch 6 - NEW LIST T81: git pull --rebase and git merge origin/main (T80 merged at b3604c1), then [T81-item-1]: hover feedback on the Shape Lattice shape handles (grow, accent fill, grab cursor, highlight controlled segment), one declared handle-hover style shared with the Frame editor handles. Commit 'T81 item 1: ...', shots, fast gate, pass back.

updated 2026-09-27T19:45:02Z

t81-randomize-segment-colors.pngt81-endrule-wrap.pngt81-boundary-section-colour.pngt81-frame-handle-hover.pngt81-shape-lattice-handle-hover.pngt80-tie-duplicate-shared-node.png

Seat C ↗ fb-app · turn 53

worker (working)

task 4/5 · 80%

epoch 3 - NEW LIST F27: git pull --rebase and git merge origin/main, then [F27-item-1]: the scissors (SE16 cut tool) must cut the lattice contour (closed loop: first cut opens it, second splits), same cut model/rulings as rails, Fusion pieces + Coincidents. Commit 'F27 item 1: ...', shots, fast gate, pass back.

updated 2026-09-27T20:05:26Z

1050_F27contourcut_6_regenerated.png1050_F27contourcut_5_recoloured.png1050_F27contourcut_4_both_joined.png1050_F27contourcut_3_line_joined.png1050_F27contourcut_2_arc_cut.png1050_F27contourcut_1_line_cut.png
Commits — main (8)
Commits — lane-b (8)
Commits — fb-app (8)